Field notes: the spoil ground that filled up two quarters before anyone renewed the permitA dredge disposal mound outgrew its permitted footprint two quarters before the paperwork caught up. Notes from watching it happen.
TSHD vs CSD: how to tell dredger types apart in satellite imageryHull shape, mooring pattern and plume geometry separate a trailing suction hopper dredger from a cutter suction dredger on overhead imagery.
Rubble mound revetment vs vertical seawall: telling them apart in satellite imageryHow to read armour stone revetment, sheet pile quay walls and slope protection apart in high-res satellite passes, without a site visit.
What a turning basin is, and why its footprint moves before any berth gets announcedTurning basin dimensions shift months before a port authority confirms a new berth. Here's what the shape is for and how to track the excavation early.
Field notes: the quarter the berth line moved twice before the press release caught upA field-notes look at the lag between what gets built at a terminal and when the port authority says so, and what that gap costs an analyst.
Breakwater extension vs. berth extension: reading the line in satellite imageryHow to tell a breakwater extension from a berth extension in satellite imagery, using line geometry, texture, and what's built behind it.
Caisson vs sheet pile: reading quay wall construction from satellite imageryHow to tell a caisson berth from a sheet-pile quay wall in satellite imagery, and why the construction method changes how you read a quarterly pass.
What is a cofferdam, and why it shows up before new berth constructionA cofferdam is the staging structure that appears before a new berth face, quay wall, or reclamation fill. Here's how to spot one in a satellite pass.
Field notes: the berth that was finished eighteen months before anyone said soA port analyst's field note on the gap between when a berth is finished and when the operator announces it.
Jack-up barge vs crane barge: telling them apart in satellite imageryHow to tell a jack-up barge from a crane barge in satellite imagery during berth construction, and what each vessel tells you about project phase.
Hydraulic fill vs rock fill: telling them apart in satellite imageryHow to read a reclamation image and tell whether a port is placing hydraulic fill or rock fill, using discharge plumes, edge shape, and haul patterns.
Trestle berth vs solid-fill quay: reading the imagery signatureHow an open-piled trestle berth shows up in satellite imagery compared to a solid-fill quay, and why the difference matters for tracking berth construction.
Confined disposal facility vs offshore spoil ground in satellite imageryHow to distinguish a confined disposal facility from an offshore spoil ground in satellite imagery, and why the difference matters for reclamation tracking.
How to tell a bund wall from a finished reclamation platform in satellite imageryA field guide to telling a perimeter bund from a settled platform in a single still, and what changes between quarterly passes.
How long does reclaimed land need to settle before construction starts?Why reclaimed port land sits idle for months or years before piling starts, what drives the consolidation period, and how to track settlement from imagery.
Estimating fill volume from before-and-after satellite imageryHow reclamation fill volume and spoil disposal tonnage get estimated from two image dates, and where RGB imagery alone falls short.
How to measure land reclamation progress from satellite imageryHow to track land reclamation progress by quarter using satellite imagery, without scheduling a site visit or waiting on a report.
What counts as a berth versus a quay wall?Berth and quay wall get used interchangeably in trade reporting, but they're not the same thing. Here's how to tell them apart in imagery.